Contact
Current position:Home > News > Enterprise News
Enterprise News
Second Special Tower Crane For Wind Power Delivered For Use
2009-06-051014中昇建机
  May, 2009, Zhongsheng second self-developed special tower crane for wind mill erection delivered for use at the construction site of Shangxi Zuoyun Wind Power Plant, constructed by Tianjin Electric Power Construction Co., Ltd. The hoisting height of this crane can reach 90 meters, maximum load can reach 80 ton within 15m working range, it can meet the assembly needs of 1.5-2.0MW wind turbine.

46.3K