Screening | Power plant construction |
Projects type: | |
Area: |
Constructed by NEPCⅠ
This project adopted two sets ZSC70360(140T).
Constructed by HEPSEC
The project adopted one set ZSC80305 (110T) and one set ZSC70240 (80T).
Constructed by HEPPCI
The project adopted one set ZSC60140 (50T) and one set ZSC70240 (80T).
Constructed by HTPC
The project adopted one set ZSC70240 (80T).
Constructed by HTPC and JTPCC
The project adopted two sets ZSC70240 (80T).
Constructed by SEPCOⅡ and HEPSEC
The adoption of one set ZSC80325 (120T) , one set ZSC60140 (50T) and one set ZSC70360 (140T).
Constructed by SEPCOⅢ
The adoption of one set ZSC70240 (80T).
Constructed by Lanco
The project adopted two sets ZSC70240(80T)and two sets ZSC7095 (40T).
Constructed by AEPC I
The project adopted one set ZSC80305(110T).
Constructed by HPCCⅠ and NEPCⅠ
This project adopted one set ZSC70240(80T) and one set ZSC70360(140T).
Constructed by SEPCC Ⅲ and SEPCC Ⅳ
This project adopted one set ZSC70240(80T) and one set ZSC65150 (50T).
Constructed by SEPCC Ⅱ and SEPCC Ⅲ
This project adopted two sets ZSC70240(80T).
Constructed by SEPCCⅠ
This project adopted one set ZSC70260(100T).
Constracted by TEPC
This project adopted one set ZSC70240(80T).