4 Travelling Luffing Tower Crane Delivered For Use At Tianjin West Station
Tianjin West Station has the largest platform in Asia. This project adopted 4 sets travelling luffing tower cranes (ZSL1100) which have 45t maximum load. 2010-11-08 |
“ZSC80140” Won High Praise
ZHONGSHENG tower crane-ZSC80140 won high praise from China Electric Power Research Institute for its excellent performance in the construction of UHV Transmission Tower Test Site. 2010-03-30 |
Operations went smoothly of ZHOGNSHEGN ZSL2700 tower crane at Shenyang Henglong Project.
Operations went smoothly of ZHOGNSHEGN ZSL2700 tower crane at Shenyang Henglong Project. 2010-02-21 |
Operations Of ZHONGSHENG ZSL750 Went Smoothly At Dalian International Convention Center
Dalian Branch of China Construction Eighth Engineering Division Co Ltd took the project of Dalian International Convention Center, adopted 2 sets travelling luffing tower cranes-ZSL750, which has 50t-maximum load within 15m. 2009-10-09 |
ZHONGSHEGN Tower Cranes Worked Well In State Key Construction Projects-Shanghai Hongqiao Airport, Magnetic Suspended Railway And High-speed Rail Hub P
Shanghai Hongqiao Airport, Magnetic Suspended Railway And High-speed Rail Hub Project were taken by Shanghai Construction Group. This huge project covers 1,300,000 square meters, has almost 240,000 square meters floor area. It is a super large project of 2009-10-09 |
Second Special Tower Crane For Wind Power Delivered For Use
May, 2009, Zhongsheng second self-developed special tower crane for wind mill erection delivered for use at the construction site of Shangxi Zuoyun Wind Power Plant, constructed by Tianjin Electric Power Construction Co., Ltd. 2009-06-05 |
Zhongsheng First Self-developed Moveable Cranes For Windmill Erection Delivered For Use
September, 2009, Zhongsheng first self-developed moveable cranes for windmill erection was put into use at Chayouqi Wind Power Plant in Inner Mongolia. 2009-03-09 |
100T Floating Crane At Qingdao Bay Bridge
100T Floating Crane At Qingdao Bay Bridge 2008-05-07 |