Screening | Power plant construction |
Projects type: | |
Area: |
Constructed by SEPCCⅠ
This project adopted ZSC70260(100T).
Constructed by JTPC
This project adopted ZSL43180(70T).
Constructed by Hubei Power Transmission and Transformation Company
This project adopted ZSLB-I (10T) dual level jibs spinning self-elevating gin pole.
Constructed by NEPCⅠ
This project adopted one set ZSC70360(140T).
Constructed by HFPC and JFPC
This project adopted two sets ZSC70240(80T).
Constructed by SPECOⅢ
This project adopted four sets ZSC70240(80T) and two sets ZSC6065(40T)
Constructed by NPC
This project adopted one set ZSC80140(60T).
Constructed by SEPCOⅡ
This project adopted two sets ZSC70240(80T).
Constructed by SEPCOⅡ
This project adopted two sets ZSC6065(40T).
Constructed by NEPC
This project adopted one set ZSC70360(140t).
Constructed by HTPC
This project adopted one set ZSC70240 (80T).
Constructed by HTPC
This project adopted one set ZSC60200 (60T).
Constructed by SEPCO II
This project adopted one set ZSC80325(120T).
Constructed by Lanco
The project adopted two sets ZSC70240(80T).
Constructed by EDAC Engineering
This project adopted two sets ZSC70240(80T).
constructed by the Indian company LANCO
This project adopted two sets ZSC70240(80T) and two sets ZSC7095(40T)