Constructed by the 2nd Bureau of CSCEC
Construction height is 452m , the project adopted one set ZSL2700 (100T),one set ZSL750 (50T).
Constructed by the 8th Bureau of CSCEC
Construction height is 530m,the project adopted one set ZSL3200(100T)、one set ZSL1700(80T) and two sets ZSL750X(50T).
Constructed by the 3rd Bureau of CSCEC
Construction height is 597m,this project adopted two sets inner-climbing ZSL2700 (100T).
Constructed by SCG
Construction height is 632m,the project adopted one set ZSL2700(100T).
Constructed by the 1st Bureau of CSCEC
Construction height is 660m, this project adopted two sets inner-climbing ZSL2700 (100T).